The PLC junction box was supplied with booster compressor and also installed offshore, in the first day of offshore commissioning we found the raining water leaked into the control panel, and we found a lot of things need to change and repair.
As observation we found the rain channel very short and slope, also the rain in sea is heavy and undirection.